All projectsMaterial handling equipment · Project 01

Manutique — Automatic Kit Box unloading

Mobile equipment designed to secure Kit Box unloading, guide operations and improve ergonomics in an industrial environment.

DisciplineHandling · Automatic unloading
Documented scope4 project stages
Manutique — Automatic Kit Box unloading — FORGIA industrial project
01 — Project journey

From requirement to industrial reality.

A documented view of the decisive engineering, manufacturing and validation steps.

  1. 01Engineering & 3D CAD
  2. 022D drawings
  3. 03Calculations & validation
  4. 04Workshop manufacturing & assembly
Stage 01

Engineering & 3D CAD

SOLIDWORKS 2022 · Overall architecture and kinematics

Stage 02

2D drawings

Assembly drawings, details and manufacturing package

Stage 03

Calculations & validation

ANSYS R18.1 · Mesh, displacements, stresses and calculation note

Stage 04

Workshop manufacturing & assembly

Stainless-steel fabrication, functional assembly and preparation for testing

Have a similar challenge?

Let’s study your
industrial project.

Request a quote